摘要 |
<P>PROBLEM TO BE SOLVED: To increase pulling resistance force with a simple structure and moreover improve the efficiency of construction work. <P>SOLUTION: A method for laying a reinforcement material comprises first, second and third steps S1, S2 and S3. In the first step S1, a banking 5A is put in a place 4 for construction on the side of a foundation 3, and the banking 5A is formed into a lower surface 6 and another higher surface 8 having a height difference with the lower surface 6 through a level difference 7. In the second step S2, a reinforcement material 9A is laid on the plurality of surfaces 6 and 8 formed in the first step S1 and the level difference 7. After the completion of the second step S2, these first and second steps S1 and S2 are repeated once. Thereafter, in the third step S3, a banking 5C is put on the exposed surface of a reinforcement material 9B and a banking 5B which are laid lastly so as to finish development. <P>COPYRIGHT: (C)2013,JPO&INPIT |