摘要 |
A wind turbine has a nacelle frame and a first hoist substantially permanently mounted on the frame. The method comprises the processes of hoisting a second, more powerful hoist and crane on the frame with the first hoist; removably mounting the second hoist and the crane on the nacelle frame; hoisting a winch using the second hoist and the crane on the frame, and removably mounting the winch on said frame; performing operations involving handling heavy parts employing said winch; and removing and lowering said winch, crane, and second hoist from the frame. |