摘要 |
The method involves constructing a fault network by constructing a multifractal density map by multiplicative cascading, and carrying history matching of a flow simulation grid by deforming the fault network through continuous deformation of the multifractal density map. An underground medium is developed according to a development scheme defined from the history matched grid. Cells are subdivided. The length of the fault network is determined. A position of the fault network is changed. |