摘要 |
SYSTEMS AND METHODS FOR SYNCHRONIZING SWITCHING WITHIN A POWER DISTRIBUTION NETWORK Systems (100) and methods (200) for synchronizing switching within a power distribution network are provided. A switch plan for restoring electrical power to a power distribution network following a power outage may be identified (205) by a control system (105). The control system (105) may be associated with a power utility and may include one or more computers. A plurality of switching operations associated with the switch plan may be identified (210) by the control system (105). The plurality of switching operations may include at least one automatic switching operation and at least one manual switching operation. A synchronized execution of the plurality of switching operations may be coordinated by the control system (105). Switch Controller(s) 140 Memory(s) jf2 Load Balancing Data Files OS 4 or Volt/VAR 165 166 Controller DMS Module 167 150 Work Order Module 168 4 Asset Managem Switching Module 169 Processor(s) 161 I/O Network Interface(s) Interface(s) Network(s) : Distributed Energy Resource(s) User Device(s) SCADA System(s) Manual Switches Network(s) Automated 100Switches |