摘要 |
<P>PROBLEM TO BE SOLVED: To provide a perforated pipe material capable of suppressing inflow of sediment into a pipe body when placing the perforated pipe material, and dissolving clogging easily even when clogging occurs in a slit after installation. <P>SOLUTION: For a perforated pipe material 1, a plurality of thin and long rectangular slits 2 whose length direction is the long length direction of a pipe body 11 are formed on an outer periphery of the pipe body, and the inside and the outside are communicated. Then, the slit is formed such that a width is 0.2-0.6 mm, and the total opening area SA of the plurality of slits is set to be three times or smaller of an inner space cross sectional area PA. <P>COPYRIGHT: (C)2013,JPO&INPIT |