摘要 |
<p>A switch plan for restoring electrical power to a power distribution network following a power outage may be identified (205) by a control system (105). The control system (105) may be associated with a power utility and may include one or more computers. A plurality of switching operations associated with the switch plan may be identified (210) by the control system (105). The plurality of switching operations may include at least one automatic switching operation and at least one manual switching operation. A synchronized execution of the plurality of switching operations may be coordinated by the control system (105).</p> |