发明名称 RAILWAY BRIDGE CONSTRUCTING METHOD USING 2 POST TYPE ABUTMENT STRUCTURE
摘要 PURPOSE: A construction method of a railway bridge using an abutment structure with two posts is provided to remarkably reduce construction time by simplifying a construction process. CONSTITUTION: A construction method of a railway bridge using an abutment structure with two posts is as follows. First and second steel pipe columns(15,16) facing each other are fixed to the construction start positions of a railway bridge. Third and fourth steel pipe columns facing each other are fixed to the construction end positions of the railway bridge. Parts of the first, second, third, and fourth steel pipe columns where are not filled with concrete are filled with concrete, and the filled concrete is cured. First and second horizontal beam molding frames(50a) are placed by crossing the gaps between the first and second steel pipe columns and between the third and fourth steel pipe columns. Reinforcing bars are arranged on the first and second horizontal beam molding frames. The first and second horizontal beam molding frames are integrated with the first, second, third, and fourth steel pipe columns. Bridge bearings are installed on the first and second horizontal beam molding frames. An existing track, a roadbed, and a bridge are removed. A bridge deck is installed on the bridge bearings using a crane.
申请公布号 KR101187282(B1) 申请公布日期 2012.10.08
申请号 KR20120022764 申请日期 2012.03.06
申请人 SEOK JUNG CONSTRUCTION CO., LTD. 发明人 WHANG, YOUN TAE
分类号 E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址