发明名称 SYSTEM AND METHOD FOR MANAGING PILE DRIVING CONSTRUCTION USING LEADER
摘要 <P>PROBLEM TO BE SOLVED: To provide a construction management system and method in which a driving precision of a pile can be improved by settling a pile head center position or the like required to the pile within predetermined allowable values after a leader is removed in a pile driving construction using the leader. <P>SOLUTION: A pile driving construction management system 10 is a construction management system in pile driving using a leader and comprises gauges 7a-7d and 8a-8d each for measuring a load in a leader member or guide portion in the leader member constituting a leader 1 in order to suppress displacement of a pile P during driving, and processing devices 11 and 12 each for processing measurement data from the gauges during pile driving, and a load exceeding a predetermined reference value can be monitored in real time to prevent the load from acting upon the leader. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012184623(A) 申请公布日期 2012.09.27
申请号 JP20110049784 申请日期 2011.03.08
申请人 PENTA OCEAN CONSTRUCTION CO LTD 发明人 MIYAZAKI TOSHIHIRO;UENO KAZUHIKO;SASAKI HIROKI
分类号 E02D13/06;E02D13/04 主分类号 E02D13/06
代理机构 代理人
主权项
地址