A METHOD FOR THE PRODUCTION OF AN INFRASTRUCTURE CHANNEL
摘要
A method for producing an infrastructure channel (1), consisting of at least two segments (2) of predetermined length, with each segment (2) being poured in one piece on the construction site using in-situ concrete (9) or ready mixed concrete.