摘要 |
<P>PROBLEM TO BE SOLVED: To provide a reinforcement method for a banking in which a paved road is laid on the top face that can be constructed at a low cost and for a short work period. <P>SOLUTION: A reinforcement method for a road banking includes a step of digging the banking below a slope shoulder of the banking, corresponding to the formation range for a slope shoulder reinforcement part, a step of forming the slope shoulder reinforcement part in the dug range, a step of forming a road bed reinforcement part on the slope shoulder reinforcement part, a step of integrally combining the slope shoulder reinforcement part with the road bed reinforcement part, and a step of forming a hard pavement layer on the road bed reinforcement part, and the above-mentioned series of steps are performed as the one side of the paved road is maintained. <P>COPYRIGHT: (C)2012,JPO&INPIT |