摘要 |
For network stabilization of an electric power supply network, the voltage at a first network connection point at a first voltage level to a power generator, and at a second network connection point to a second voltage level, as well as at at least one third network connection point to a load, are each sensed as a voltage measurement, wherein a reactive power draw or a reactive power delivery by the power generator is ascertained using a linkage of the voltage measurements with the geographic location of the relevant network connection point.
|