摘要 |
<P>PROBLEM TO BE SOLVED: To provide a jig for fixing a seismic isolation baseplate, capable of positioning the baseplate in a period after placing concrete and before curing the concrete, which has not been achieved with conventional jigs for fixing the seismic isolation baseplate. <P>SOLUTION: A jig 1 for fixing a seismic isolation baseplate which allows a portal body 4 striding over the baseplate 14 to suspend the baseplate 14, enables the vertical (z) direction and the right-left (x) direction to be adjusted with a suspending bolt 5 which suspends the baseplate 14 from a beam 2 of the portal body 4, and enables the front-rear (y) direction to be adjusted at a lower part of a column 3 of the portal body 4. <P>COPYRIGHT: (C)2012,JPO&INPIT |