摘要 |
PURPOSE: A method for installing a panel unit on a climbing apparatus is provided to reduce construction time and costs by reducing the construction time of an external wall finishing material. CONSTITUTION: A method for installing a panel unit on a climbing apparatus is as follows. First-stage reinforced concrete having first-stage buried anchors and footing concrete is placed on a part where an external wall of an underground layer is formed. Second-stage reinforced concrete having second-stage buried anchors is placed on the first-stage reinforced concrete. A panel support(CA4) having a panel unit(P) is installed on the second-stage buried anchors. Three-stage reinforced concrete is placed on the top of the panel support. First and second stage buried anchor connections are installed on the first-stage and second-stage buried anchors, respectively. The top and middle ends of vertical connections are connected to the first and second stage buried anchor connections, respectively. A climbing apparatus is installed by connecting a panel support connection to the panel support. |