摘要 |
<P>PROBLEM TO BE SOLVED: To set time information of a document in a relation with a period in which a commencement and a termination are determined, in the document related to work that is performed within the period. <P>SOLUTION: With the document information related to the work to be performed within the period in which the commencement and the termination are determined, defined as a processing object, an information processing program causes an information processor to acquire first time information representing a time, and second time information representing a date when document information is created or changed, that are included in the document information defined as the processing object. The information processor is configured to perform a step for selecting the first information when the fist time information is included between the commencement and the termination, performs and to perform a step for selecting the second time information, when the second time information is included between the commencement and the termination, in a predetermined order. <P>COPYRIGHT: (C)2012,JPO&INPIT |