发明名称
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a plant monitoring control system for achieving proper guidance when a complicate operation procedure is included, or even when an operation sequence is changed by an operator. <P>SOLUTION: An operation selection result database 114 of a recommended operation selection device 110 is configured to adapt similarity between a series of operations performed till this time and individual operations registered in a personal operation database 111 by a pattern matching method on the basis of the past plant data accumulated in a plant measured value database 150 and operation history data accumulated in an operation history database 160. A recommended operation selection part 113 estimates an operation which is currently executed on the basis of the similarity, and selects a recommending operation to be recommended next on the basis of the estimation result. <P>COPYRIGHT: (C)2011,JPO&INPIT</p>
申请公布号 JP5014370(B2) 申请公布日期 2012.08.29
申请号 JP20090079509 申请日期 2009.03.27
申请人 发明人
分类号 G05B23/02 主分类号 G05B23/02
代理机构 代理人
主权项
地址