Using mines and tunnels for treating subsurface hydrocarbon containing formations
摘要
A system for treating a subsurface hydrocarbon containing formation is disclosed. The system includes one or more tunnels. The tunnels have an average diameter of at least 1 m. At least one tunnel is connected to the surface. Two or more wellbores extend from at least one of the tunnels into at least a portion of the subsurface hydrocarbon containing formation. At least two of the wellbores contain elongated heat sources configured to heat at least a portion of the subsurface hydrocarbon containing formation such that at least some hydrocarbons are mobilized.
申请公布号
AU2009251533(B2)
申请公布日期
2012.08.23
申请号
AU20090251533
申请日期
2009.04.10
申请人
SHELL INTERNATIONALE RESEARCH MAATSCHAPPIJ B.V.
发明人
PRINCE-WRIGHT, ROBERT GEORGE;MARWEDE, JOCHEN;HWANG, HORNG JYE;MCDONALD, DUNCAN CHARLES;BURNS, DAVID BOOTH