发明名称 THE PARTIAL DISCHARGE MEASURING METHOD FOR POWER CABLE IN NUCLEAR POWER PLANT USING VLF VOLTAGE SOURCE AND HFCTPD DEVICE
摘要 PURPOSE: A nuclear power plant high tension cable partial electric discharge measurement method is provided to prevent an electric shock, failure, or the stop of a nuclear power plant generated while driving in beforehand. CONSTITUTION: A high tension cable conductor(4) is exposed to both ends of a high tension cable(3). Three phases of one end of the high tension cable conductor are connected with an extremely low frequency pressure apparatus(7) in a lump. A high tension cable shield wire(5) is connected with ground(6). A high frequency converter(2) is fixed and coupled between the high tension cable shield wire and the ground. A frequency band of the extremely low frequency pressure apparatus is selected as one voltage among 0.01Hz to 0.1Hz. The extremely low frequency pressure apparatus applies a voltage of 1U0 to 3U0 to the high tension cable. A partial discharge measurement system analyzes whether partial discharge corresponding to the frequency band of the extremely low frequency pressure apparatus is detected or not.
申请公布号 KR101165298(B1) 申请公布日期 2012.07.19
申请号 KR20110078445 申请日期 2011.08.08
申请人 KOREA HYDRO & NUCLEAR POWER CO., LTD. 发明人 HA, CHE WUNG;LIM, WOO SANG;JOO, KWANG HO
分类号 G01R31/12;G01R31/08 主分类号 G01R31/12
代理机构 代理人
主权项
地址