发明名称 METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST
摘要 FIELD: construction. ^ SUBSTANCE: method for erection of a bridge support pillar on permafrost soil consists in boring a well with a larger cross section compared to the cross section of the pillar, installation of the pillar into the well, filling a pocket between the well walls and the pillar with interstitial water and subsequent freezing of the pillar walls with the interstitial water and the surrounding soil. The novelty in the proposed invention is the fact that the interstitial water is filled into the pocket in a dry frozen condition, besides, upon filling of the pocket with the interstitial water, the pillar, the dry frozen interstitial water and soil adjacent to the well walls are heated with duration "ä1". Besides, duration "ä1" of heating for hollow metal pillars is determined on the basis of the appropriate ratio. The cooling operation may also be carried out for pillars from metal pipes by filling of the pocket with cold air, and the same time duration "ä2" of cooling is identified using the appropriate formula. ^ EFFECT: invention provides for reliable freezing of a bridge support pillar side surface with a surrounding soil massif. ^ 3 cl, 2 dwg
申请公布号 RU2455418(C2) 申请公布日期 2012.07.10
申请号 RU20090131675 申请日期 2009.08.24
申请人 PASSEK VADIM VASIL'EVICH;GERASIMOV VASILIJ ANATOL'EVICH;VELICHKO VLADIMIR PAVLOVICH;DROBYSHEVSKIJ BORIS ALEKSANDROVICH;TSUKANOV NIKOLAJ ALEKSEEVICH;PASSEK VJACHESLAV VADIMOVICH 发明人 PASSEK VADIM VASIL'EVICH;GERASIMOV VASILIJ ANATOL'EVICH;VELICHKO VLADIMIR PAVLOVICH;DROBYSHEVSKIJ BORIS ALEKSANDROVICH;TSUKANOV NIKOLAJ ALEKSEEVICH;PASSEK VJACHESLAV VADIMOVICH
分类号 E01D19/02 主分类号 E01D19/02
代理机构 代理人
主权项
地址