摘要 |
PURPOSE: An installation method of furnace equipment is provided to reduce the costs for welding upper and lower steel converter shells by loading a converter assembled out of upper and lower converter shells in a steel making factory. CONSTITUTION: An installation method of furnace equipment comprises the steps of: arranging a trunnion ring and a tilting device in a platform inside a factory(S110), loading a converter in the factory(S120), placing the converter on a saddle mounted on a carriage(S130), driving the carriage to insert and couple the converter to the trunnion ring(S140), and tilting the converter so that the inlet of the furnace faces upward(S150). |