发明名称 SYSTEM AND METHOD FOR OPERATING EGS POWER PLANT SUPPLYING PEAK LOAD POWER DEMAND OF ELECTRICAL POWER SYSTEM
摘要 PURPOSE: An operation system and a method for an EGS geothermal power plant is provided to control the amount of electricity by artificially controlling the flow rate of geothermal water. CONSTITUTION: An operation system and a method for an EGS geothermal power plant comprises following steps. Necessary facilities are installed and built. The several enhanced geothermal systems are coupled to the EGS geothermal power plant(2). Injection water is injected into the periodic enhanced geothermal systems. Left electricity is supplied to an electrical power system(1) by priority. Necessary emergency electricity is generated by operating a compressed air plant, and supplied to the electrical power system.
申请公布号 KR20120068780(A) 申请公布日期 2012.06.27
申请号 KR20120046151 申请日期 2012.05.02
申请人 RHEE, SHIE WOO 发明人 RHEE, SHIE WOO
分类号 F24J3/08;F03G7/05 主分类号 F24J3/08