摘要 |
<P>PROBLEM TO BE SOLVED: To provide a packaging material of an outdoor unit for calling attention to decrease malfunction due to pipe connection work. <P>SOLUTION: The packaging material 5 of the outdoor unit in an air conditioner includes: a cover 3 for covering a pipe connection part 2 to perform pipe connection with an indoor unit; and an opening 4 for passing the pipe connected with the indoor unit in the cover 3. A display part 6 for calling attention of pipe connection work is arranged at a place which is fitted in the opening 4 and which is watched from the outside of the packaging material 5. Consequently, when attaching the cover after the pipe connection work, the packaging material obstructs the work and the cover cannot be attached, resulting in detaching the packaging material. Accordingly, a worker necessarily confirms the caution of the work indicated on the packaging material, and thereby the confirmation after the work is performed sufficiently and the malfunction due to the work is eliminated. <P>COPYRIGHT: (C)2012,JPO&INPIT |