发明名称 METHOD OF BUILDING CONSTRUCTION
摘要 A method of construction. A first step involves stabilizing prefabricated load bearing walls for an underlying vertical level of a multi-story building. The walls have opposed surfaces and a top peripheral edge. A second step involves securing floor joists for an overlying vertical level to at least one of the opposed surfaces of the walls of one of the underlying vertical level. A third step involves installing prefabricated load bearing walls for the overlying vertical level along the top peripheral edge of the underlying vertical level. The walls have opposed surfaces and a top peripheral edge. The steps set forth above are repeated until a desired number of vertical levels are installed.
申请公布号 CA2615154(C) 申请公布日期 2012.06.19
申请号 CA20072615154 申请日期 2007.11.20
申请人 发明人
分类号 E04G21/00;E04B1/00;E04B1/348;E04B1/35 主分类号 E04G21/00
代理机构 代理人
主权项
地址