发明名称 CONSTRUCTION METHOD FOR PROTECTING IMPERVIOUS MATERIAL LAYER OF PARTITION REVETMENT FOR FILLED GROUND
摘要 <P>PROBLEM TO BE SOLVED: To cope with waste dumped into a disposal site, by constructing a base of a structure, an end of an impervious sheet or a connection part between the impervious sheets and an impervious material layer, and constructing a protective plate and the like for protecting the impervious material layer, on the waste landfill disposal site constructed by dividing a sea area by partition revetment. <P>SOLUTION: A shallow recessed trench 23 is provided on a seabed for constructing an impervious wall, and a caisson 21 is erected thereon to construct the impervious wall 20. Plate members 28 with high concrete strength are compactly spread all over a top surface of an impervious material layer 25 filling a base of the caisson, so as to constitute an impervious protective layer for protecting the top surface of the impervious material layer. Thus, the impervious material layer is not affected even by a strong collision with a corner of waste and the like. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012112145(A) 申请公布日期 2012.06.14
申请号 JP20100260819 申请日期 2010.11.24
申请人 WORLD ENGINEERING KK;NIPPON ROAD CO LTD:THE;NIPPON KAIJO KOJI KK 发明人 WAGI TAKATSU;ORIGASA MASAMI;NONODA MITSURU;KANETANI MITSUO;NAKANO HIROSHI
分类号 E02B3/06;B09B1/00 主分类号 E02B3/06
代理机构 代理人
主权项
地址
您可能感兴趣的专利