发明名称 |
Concrete Construction Method For Slab And Core Wall Construction The Same Time Using Temporary Columns |
摘要 |
PURPOSE: A method for simultaneously placing concrete on a slab and a core wall using temporary support columns is provided to remarkably reduce construction time and costs by uniting overlapped construction processes. CONSTITUTION: A method for simultaneously placing concrete on a slab and a core wall using temporary support columns is as follows. Multiple steel columns are installed on an N layer of a structure(a). Multiple temporary support columns having the height of a layer are installed on the tops of N layer steel beams to surround a core part on the N layer(b). Multiple N+1 layer steel beams are installed between the tops of the steel columns and the temporary support columns(c). A deck plate is installed on the tops of the N layer steel beams(d). Reinforcing bars for forming a core wall on an N-1 layer and a core wall form are installed(e). Concrete is simultaneously placed on the top of the deck plate and the N-1 layer core wall(f).
|
申请公布号 |
KR20120061423(A) |
申请公布日期 |
2012.06.13 |
申请号 |
KR20100122739 |
申请日期 |
2010.12.03 |
申请人 |
SAMSUNG C&T CORPORATION |
发明人 |
KANG, SHIN HYUCK;LEE, YOON SANG;KIM, JUNG SUK |
分类号 |
E04B1/34;E04B2/84;E04B5/00 |
主分类号 |
E04B1/34 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|