发明名称 MONITORING DEVICE INSTALLATION METHOD AND APPARATUS
摘要 <p>A method for installing a monitoring device with the simultaneous loading of a particulate catalyst into a vertical catalyst tube includes (i) introducing a monitoring device into the tube, (ii) introducing monitoring device alignment apparatus into the tube, (iii) introducing catalyst loading apparatus into the tube, (iv) loading catalyst particles into the top of the tube whereinafter they contact said catalyst loading apparatus as they pass down the tube, forming a uniform bed of catalyst beneath said catalyst loading apparatus and alignment apparatus and around said monitoring device, and (v) simultaneously removing the catalyst loading apparatus and alignment apparatus from the catalyst tube in timed relationship to the catalyst loading. The monitoring device alignment apparatus includes a ring member and two or more spacing members affixed to the ring member such that the ring member and the monitoring device are centrally positioned within the tube.</p>
申请公布号 EP2459305(A1) 申请公布日期 2012.06.06
申请号 EP20100738025 申请日期 2010.07.07
申请人 JOHNSON MATTHEY PLC 发明人 BRIGHTLING, JOHN ROBERT;SHAH, JUMAL AHMAD
分类号 B01J8/00 主分类号 B01J8/00
代理机构 代理人
主权项
地址