发明名称 CONSTRUCTION METHOD OF HORIZONTAL FORCE TRANSMISSION STRUCTURE
摘要 <P>PROBLEM TO BE SOLVED: To provide a construction method of a horizontal force transmission structure which is easy to construct. <P>SOLUTION: A horizontal force transmission structure 10 includes a soil improvement body 12, a foundation part 16, and a steel rod 14 inserted between the soil improvement body 12 and the foundation part 16. For the steel rod 14, in the state of projecting a head part from an upper surface 12F of the soil improvement body 12, the lower part is fixed to the soil improvement body 12, and the upper part is fixed to the foundation part 16. The horizontal force transmission structure 10 is constructed through the following processes. First, a boring process is executed. That is, after constructing the soil improvement body 12, a hole 20 is bored on the upper surface 12F of the soil improvement body 12. Then, a horizontal force transmission member fixing process is executed. That is, the steel rod 14 is inserted to the hole 20 and mortar 22 is filled. The upper part of the steel rod 14 is projected from the upper surface 12F of the soil improvement body 12. Finally, a foundation part construction process is executed. That is, the foundation part 16 is constructed on the soil improvement body 12. The foundation part 16 is constructed with concrete and swallows the upper part of the steel rod 14. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012102573(A) 申请公布日期 2012.05.31
申请号 JP20100253128 申请日期 2010.11.11
申请人 TAKENAKA KOMUTEN CO LTD 发明人 OMOTO SATOSHI;HAMADA JUNJI;HONDA TAKESHI
分类号 E02D27/34;E02D3/12 主分类号 E02D27/34
代理机构 代理人
主权项
地址