摘要 |
A control system for use at a dump location having a plurality of dump sites is disclosed. The control system may have a control module associated with a mobile machine and a worksite controller. The worksite controller may be configured to receive a signal from the control module indicative of the mobile machine crossing a boundary at a dump location, and assign a travel route for the mobile machine based on the signal. The travel route may include a travel segment on a common entrance row, a first single-use path from the common entrance row to a particular one of the plurality of dump sites, a second single-use path from the particular one of the plurality of dump sites to a common exit row, and a travel segment on the common exit row. The worksite controller may be further configured to communicate the travel route to the control module as the mobile machine moves toward the dump location.
|