发明名称 Optimumized method of flooding analysis during main feedwater line break sub-compartment outside reactor building for nuclear power plant
摘要 PURPOSE: A method for optimally analyzing an external sub compartment outside a nuclear reactor building when a main water supply pipe of a nuclear power plant is damaged is provided to optimize a discharging amount. CONSTITUTION: A discharging amount is calculated when a main water supply pipe(60) is damaged. It is determined whether a main water supply adjusting valve(65) is closed. A plurality of water supply pumps(90) is stopped. A damaged location of the main water supply pipe is determined. A discharging amount is calculated when a water supply pipe is damaged.
申请公布号 KR101146949(B1) 申请公布日期 2012.05.22
申请号 KR20090104219 申请日期 2009.10.30
申请人 发明人
分类号 G21C15/18;G21C17/00 主分类号 G21C15/18