发明名称 EXCAVATION METHOD FOR PRE-NAILED TUNNELING
摘要 PURPOSE: A digging method of a pre-stressing nail tunnel is provided to reduce boring amount and to excavate inner gang pre-stressing and inner gang pre-stressing nail tunnel at once blasting. CONSTITUTION: A digging method of a pre-stressing nail tunnel is composed like next. A pre-stressing nail is drilled on the face supposed to be drilled and a pre-support guide hole(30) at a pilot tunnel by additionally assembling a horizontal contour hole(40), a horizontal stopping hole(50), and a horizontal bottom hole. Those are blasted a pre-support empty hole, a horizontal outer hole, a horizontal magnifying hole, and a horizontal base ball.
申请公布号 KR101148331(B1) 申请公布日期 2012.05.21
申请号 KR20090078000 申请日期 2009.08.24
申请人 发明人
分类号 E21D9/04 主分类号 E21D9/04
代理机构 代理人
主权项
地址