发明名称 System and method for simulation, modeling and scheduling of equipment preparation in batch process manufacturing facilities
摘要 A method and system for simulating, modeling and scheduling equipment preparation procedures in the biopharmaceutical production process is described herein. The use of process vessels in batch process manufacturing is optimized through the use of peak load scheduling frames. The system and method includes the steps of identifying soiled process components and their associated equipment preparation procedures. After the soiled process components are identified, a master list of soiled process components and their associated equipment preparation procedures is generated. After the soiled process components and the equipment preparation procedures are identified, the equipment preparation procedures are scheduled out based on preparation equipment protocols to generate a equipment preparation load summary table. Next, the size and capacity of the preparation equipment is determined based on the information in the load summary table. After the size and capacity of the preparation equipment is determined, an equipment preparation time line is generated.
申请公布号 US8180615(B2) 申请公布日期 2012.05.15
申请号 US20090415634 申请日期 2009.03.31
申请人 BROWN PETER G. 发明人 BROWN PETER G.
分类号 G06G7/48;B01J19/00;G05B17/02;G05B19/00;G05B19/19;G05B19/418;G06Q10/00 主分类号 G06G7/48
代理机构 代理人
主权项
地址