摘要 |
<P>PROBLEM TO BE SOLVED: To provide a technique that a train operation for several hours in the future is simulated on the basis of a train operation track record obtained, in order to reduce a burden on a mandator who manages an operation organization task for recovering an operation plan and assist an upgrade of a skill, when the train operation is disrupted. <P>SOLUTION: An operation organization assistance system has a schedule data table 1210 which stores the operation plan, a data update unit 1110 which updates the operation plan, a track record schedule update unit 1120 which updates track record time with respect to the operation plan, a prediction calculation unit 1130 which performs a train operation simulation on the basis of the operation plan and the track record time, and a station device 2100 which obtains a traveling track record of a train. The system includes a correction data generation unit 1140 which generates correlation data between different line section entering time and exiting time of a train which extends over line sections at a line section boundary station, a prediction time correction unit 1150 which corrects a prediction calculation result of the line section boundary station, and a correction data table 1220 which stores data generated by the correction data generation unit. <P>COPYRIGHT: (C)2012,JPO&INPIT |