发明名称 INTEGRATION OF AN IN-SITU RECOVERY OPERATION WITH A MINING OPERATION
摘要 There is a general need for improved efficiencies in the bitumen and heavy oil recovery and extraction industry. The present invention is directed to a method and system for integrating an in-situ bitumen recovery operation with a bitumen mining operation for improved efficiencies and synergies therebetween. The method comprises the basic steps of obtaining a production fluid from the in-situ bitumen recovery operation, directing the production fluid to the bitumen mining operation, and incorporating the production fluid into the bitumen mining operation. The basic integrated system comprises a production well for recovering production fluid from the in-situ bitumen recovery operation, a bitumen mining and extraction facility, and a transporter for directing the production fluid from the production well to the bitumen mining and extraction facility for incorporation into the mining and extraction operation. The in-situ recovery operation may be a thermal operation, such as steam-assisted gravity drainage (SAGD), cyclic steam stimulation (CSS), or a derivative thereof. The integrated method and system of the present invention provide the potential to reduce capital investment, operating costs, overall land footprint and fluctuations in mine production, compared with stand-alone in-situ recovery and mining operations. The integrated method and system of the invention also provide the potential for commercial development of smaller scale in--situ recovery operations.
申请公布号 CA2610463(C) 申请公布日期 2012.04.24
申请号 CA20072610463 申请日期 2007.11.09
申请人 IMPERIAL OIL RESOURCES LIMITED 发明人 DUNN, JAMES A.;SPEIRS, BRIAN C.
分类号 E21B43/24;C10G1/04;E21B43/241;E21B43/34 主分类号 E21B43/24
代理机构 代理人
主权项
地址