发明名称 ROADBED IMPROVEMENT METHOD
摘要 <P>PROBLEM TO BE SOLVED: To provide a roadbed improvement method that achieves simplification and a reduction in work burden by enabling formation of an improved-soil roadbed stabilized by solidifying a soft roadbed under a track, deformed and sludged by fluidization caused by rainwater and the like. <P>SOLUTION: In a roadbed improvement method, when ballast is backfilled in a ballast-partially-removed location after the partial removal of the ballast under a railroad track, the ballast for backfilling is partially substituted with a partially-hardened body of a hydraulic composition, in which the hydraulic composition is partially hydrated and hardened by containing water falling bellow the theoretical amount of hydrated water of the hydraulic composition. Thus, the partially-hardened body of a hydraulic composition is crushed or worn away, dropped to a roadbed and mixed into soil forming the roadbed, and solidified by water contained in mud in the roadbed and water such as rain water, so as to improve the soil of the roadbed. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012077453(A) 申请公布日期 2012.04.19
申请号 JP20100220873 申请日期 2010.09.30
申请人 SUMITOMO OSAKA CEMENT CO LTD 发明人 MIYAWAKI KENJI;YOSHIHARA MASAHIRO
分类号 E01B37/00;E01B1/00 主分类号 E01B37/00
代理机构 代理人
主权项
地址