摘要 |
<P>PROBLEM TO BE SOLVED: To provide a demolition method of a boiler and a boiler building, capable of reducing processes and a construction period by reducing the number of required reinforcing members, and effectively utilizing materials of the reinforcing members. <P>SOLUTION: In the demolition method of a boiler 110 and a boiler building 100 housing it, the boiler building 100 is a structure of a steel frame brace structure, the plurality of boiler buildings 100 are adjacently installed and connected to each other by disposing a reinforcing member 200 near the upper parts of the adjacent boiler buildings 100, a part of a column 136, a beam 134 or a brace 130 covering the boiler 110 is removed, and the boiler 110 is removed. <P>COPYRIGHT: (C)2012,JPO&INPIT |