摘要 |
<P>PROBLEM TO BE SOLVED: To rationally ensure redundancy of N+1 or N+2 in an air conditioning system constructed to have multiple stories. <P>SOLUTION: In a building 1 having rooms R1-RF with high heat generating devices installed therein, in first to F stories, each of the rooms R1-RF is divided into a plurality of unit air-conditioning regions in which the high heat generating devices are collected, and the maximum amounts of heat generation are approximately equal to each other. In the indoor air conditioners AC1-AC6 each having a capacity for processing the maximum amount of heat generation of the unit air-conditioning region, and supplying the conditioned air indoors, first to sixth groups G1-G6 are constituted by the indoor air conditioners of each story installed on the vertically-same positions of the multiple stories. The building 1 includes one or two auxiliary air conditioning system modules for supplying a heat medium from an auxiliary heat source device ER to auxiliary indoor air conditioners 1RC-RC respectively installed on each of the stories approximately at the same positions in the vertical direction, of the multiple stories. <P>COPYRIGHT: (C)2012,JPO&INPIT |