摘要 |
<P>PROBLEM TO BE SOLVED: To improve workability in supplying urea water by providing a large capacity urea water tank in an easily accessible place without reducing the size of an article storage. <P>SOLUTION: In a fuel tank 12, the flange part 14A1 of the upper plate 14A of a second plate body 14 overhangs the front plate 13B of a first plate body 13 forming a peripheral wall surface. And as a result, an extra space 15A is formed in the front side of the front plate 13B and under the flange part 14A1 of the upper plate 14A. A urea water tank 24 is configured to be placed with its rear side part in the extra space 15A and in contact with the fuel tank 12. Therefore, the capacity of the urea water tank 24 can be increased without reducing the size of an article storage 16 by making the rear side part of the urea water tank 24 enter into the extra space 15A which is formed in the front side of the fuel tank 12. <P>COPYRIGHT: (C)2012,JPO&INPIT |