发明名称 METHOD FOR EXCAVATING SUBMARINE SURFACE AND CONSTRUCTING SUBMARINE VERTICAL WATERWAY
摘要 <p>PURPOSE: A sea floor excavation and construction method is provided to prevent the subsidence of a casing due to excessive excavating load by connecting a support to the casing. CONSTITUTION: A sea floor excavation and construction method is as follows. A jack-up barge(10) is fixed to arrange a casing in a dredging side. A guide frame is established in one side of the jack-up barge. The casing is up pulled to arrange the casing on the dredging side using the guide frame. The underwater concreting is poured in the circumference of the casing. A subsidence preventive support supporting the upper side of 'the underwater concreting placed in the outer circumference of casing is established. The excavator is inserted into casing and the dredging side is out dug perpendicularly.</p>
申请公布号 KR101119195(B1) 申请公布日期 2012.03.21
申请号 KR20110122939 申请日期 2011.11.23
申请人 SAMBO TOTAL SERVICE FOUNDATION CONSTRUCTOR CO., LTD. 发明人 PARK, HO SUNG;PARK, JUNG HWAN;JOENG, JAE JIN;HWANG, JIN SUG;SONG, JAE MYEON;JANG, HYUN GUI
分类号 E21B7/136;E21B15/02;E21D1/00;E21D5/04 主分类号 E21B7/136
代理机构 代理人
主权项
地址