发明名称 METHOD FOR CREATING PROTECTIVE SLAG LINING IN SHAFT OF BLAST FURNACE
摘要 FIELD: metallurgy. ^ SUBSTANCE: method involves creation of slag lining mixture consisting of iron ore, agglomerate and pellets in ratio of (115):(4094):(545) respectively. At lining of furnace shaft with high heat conducting materials the obtained slag lining mixture is charged to the specified portion of charging cycle, thus obtaining the primary melt with iron oxide (16-30)% in quantity of 20-30% of the weight of slag lining mixture. Charging of slag lining mixture is completed in 18-72 hours after the allowable heat load on coolers of blast furnace shaft is obtained. When slag lining mixture is being supplied, theoretical burning temperature in combustion zone of blast furnace is decreased by 30-80C. ^ EFFECT: reducing the coke and natural gas consumption and increasing the furnace efficiency. ^ 3 cl, 1 tbl
申请公布号 RU2445375(C2) 申请公布日期 2012.03.20
申请号 RU20100124739 申请日期 2010.06.16
申请人 OBSHCHESTVO S OGRANICHENNOJ OTVETSTVENNOST'JU "SEVERSTAL'-PROEKT" (OOO "SEVERSTAL'-PROEKT") 发明人 LOGINOV VALERIJ NIKOLAEVICH;SUKHANOV MIKHAIL JUR'EVICH;KARIMOV MIKHAIL MURTAZAKULOVICH;LOGINOV IGOR' VALER'EVICH;VASIL'EV LEONID EVGEN'EVICH;BOL'SHAKOV VADIM IVANOVICH;NESTEROV ALEKSANDR STANISLAVOVICH;MOZHARENKO NIKOLAJ MIKHAJLOVICH;JAKUSHEV VLADIMIR SERGEEVICH;IVANCHA NIKOLAJ GRIGOR'EVICH
分类号 C21B5/00 主分类号 C21B5/00
代理机构 代理人
主权项
地址