摘要 |
<p>When a schedule plan or an operation plan/vehicle operation plan have been changed, operations are assigned, starting with a vehicle with the lowest work priority (degree of work importance and degree of work urgency). Next, a final arrival section after the vehicle operation plan change is checked. The vehicle for which the final arrival section of vehicle operation plan post-change information and a planned expected arrival section are different from each other is extracted, the vehicle operation plan is changed for each extracted section so that arrival at the same section as the expected arrival section can be achieved. The processing permits reducing urgent work and out-of-service driving even in a case where the schedule plan has been changed on an appointed day.</p> |