发明名称 METHOD OF CONSTRUCTING GROUND OF LANDFILL WITH DERDGED SOIL FOR TREE PLANTING
摘要 PURPOSE: A constructing method of the ground from landfills with dredged soil for tree planting is provided to reduce the stabilization period for soft ground formed with the dredged soil. CONSTITUTION: A constructing method of the ground from landfills with dredged soil for tree planting comprises the following steps: digging the dredged soil from a reclaimed ground surface layer into the predetermined depth; spread a drainage layer material selected from gravels, wood chips, or a first soil improver on the dug up space to form a drainage layer; preparing a vegetating soil composition by mixing the dredged soil with a second soil improver, and installing the composition on the drainage layer to form a vegetation layer; planting trees on the vegetation layer; and sowing seeds on the vegetation layer for fixing the surface of the ground.
申请公布号 KR101115053(B1) 申请公布日期 2012.03.06
申请号 KR20110101665 申请日期 2011.10.06
申请人 KALIM ENVIRONMENT CO., LTD.;THE REPUBLIC OF KOREA (FORESTRY ADMINISTRATION FORESTRY RESEARCH INSTITUTE) 发明人 JEONG, YONG HO;LIM, JOO HOON;LEE, IM KYUN;SEO, KYUNG WON;KIM, JUNG HO
分类号 A01G1/00;C05F15/00;C09K17/00 主分类号 A01G1/00
代理机构 代理人
主权项
地址