摘要 |
<p>The invention concerns a linking system (10) for fixing building elements (20, 30) such as natural or artificial stones. The linking system (10) comprises: a first dowel (60) having a first internal orifice (80) comprising a first hole axis, and which is introduced into a first building element (20) by being adapted to be fixed into a first hole (40) which has a first hole axis; and a second dowel (70) having a second internal hole (90), and which is introduced into a second building element (30) by being adapted to be fixed into a second hole (50) which has a second hole axis. Between the first dowel (60) and the second dowel (70) is provided a sleeve (100) wherein a rod (110) is inserted.</p> |