摘要 |
<P>PROBLEM TO BE SOLVED: To provide a glass run channel assembly constituted so that a projection as a positional dislocation preventive structure can be accurately and stably formed in a predetermined position of the glass run channel assembly. <P>SOLUTION: A projection section 165 capable of installing an engaging member 200 and engageably formed in an engaging section arranged in a groove of a window frame, is provided in a base section 175 of a connection glass channel of this glass run channel assembly. A root support section 168 is formed on an inner peripheral side surface of the base section. A projection section and an insert hole 160 capable of inserting a trunk section 205 of the engaging member, are formed in a range corresponding to the root support section. Longitudinal directional locking sections 185, 188 and a width directional locking section locking to the trunk section when inserting the engaging member into the insert hole, are respectively formed by at least one on an inner wall for constituting the periphery of the insert hole, that is, an inner wall 177 in the longitudinal direction and an inner wall in the width direction of the connection glass run channel. <P>COPYRIGHT: (C)2012,JPO&INPIT |