摘要 |
<P>PROBLEM TO BE SOLVED: To provide a new reinforcement method which is capable of reducing work by qualified persons and quickly assigning manpower and is advantageous when shortening a construction period and reducing a construction cost. <P>SOLUTION: A drill screw 26 or a driving rivet is driven to parts on both sides in the width direction of a steel plate 60 respectively matched with a second plate part 6204, and the second plate part 6204 is temporarily fixed to parts on both sides in the width direction of the steel plate 60 respectively (a process of temporarily fixing the second plate part). A first plate part 6202 of each erection piece 62 temporarily fixed to the steel plate 60 is matched with a flange 5202 of angle steel 52, positioned, and temporarily fixed by a drill screw 26 or a driving rivet (a process of temporarily fixing the first plate part). When a required number of steel plates 60 are temporarily fixed to an existing steel structure member 12C, a part over the entire length of an edge positioned at both ends in the width direction of each steel plate 60 is joined by welding Y21 to the flange 5202 of the angle steel 52 (a welding process). <P>COPYRIGHT: (C)2012,JPO&INPIT |