摘要 |
<P>PROBLEM TO BE SOLVED: To provide a treatment method of ground surface layer capable of shortening a construction period and securing the quality of a rigid reinforcement body by controlling a solidification temperature in a fluid solidification material filled in a bag body. <P>SOLUTION: In a treatment method of ground surface layer, a bag body 1 to be filled with a fluid solidification material is laid to be lattice-like on a planar member 2 laid on the ground, and the fluid solidification material is filled and solidified in the bag body 1 so as to form a rigid reinforcement body. In the treatment method of ground surface layer, a temperature adjustment member 3 is laid together with the bag body 1 so that a solidification temperature of the fluid solidification material filled in the bag body 1 can be adjusted. <P>COPYRIGHT: (C)2012,JPO&INPIT |