摘要 |
PROBLEM TO BE SOLVED: To provide a connection structure of triangular panel block bodies in a dome house in which finish is improved and the efficiency of workability is enhanced and the leaking of rain can be prevented completely by simultaneously conducting the installation of triangular steel plates and the double sticking of a roofing at the same time as the connection works of a large number of the triangular panel block bodies when the panel block bodies are combined, and its manufacturing method. SOLUTION: In the connection structure of the triangular panel block bodies 2 in the dome house and its manufacturing method, the triangular panel block bodies 2 and the triangular steel plates having the same shape as the triangular panel block bodies are stuck through the roofings 6 larger than the external shapes of the triangular panel block bodies while the roofings are superposed and stuck doubly to each connecting section of the triangular panel block bodies 2.
|