发明名称 Foundation construction methods
摘要 PURPOSE: A square pyramid foundation and construction method thereof is provided to maintain the optimum stable state of foundation by reducing the pressure of underwater. CONSTITUTION: A square pyramid foundation is composed like next. The pit excavation is performed in a construction field according to design. The ground, in which excavation is completed, is stepped to be even. A square pyramid foundation(100) is established in the design area. Rubble is filled and stepped in the space part formed in the square pyramid in the foundation. A steel reinforcement(32) is arranged in the total area top in which the square pyramid basis is installed. The concrete is poured in the prescribed thickness and cured.
申请公布号 KR20120012358(A) 申请公布日期 2012.02.09
申请号 KR20100074464 申请日期 2010.07.31
申请人 KIM, SUNG PIL 发明人 KIM, SUNG PIL
分类号 E02D27/14;E02D5/48 主分类号 E02D27/14
代理机构 代理人
主权项
地址