发明名称 Method for controlling switch-ON of load e.g. incandescent lamp of illuminating device installed in road, calculating total time for swtiching ON all loads and controlling swtich-ON of load within calculated total time
摘要 <p>The method involves determining number of loads (V-1-V-n) connected to power supply device (4), to be swtiched ON. The individual switch-ON time for each load is determined. The total time for swtiching ON all loads is calculated using determined individual switch-ON time for each load. The control for swtiching ON the individual load within calculated total time is performed while avoiding the simultaneous switching ON of loads. An independent claim is included for device for controlling switch-ON of load.</p>
申请公布号 DE102010033633(A1) 申请公布日期 2012.02.09
申请号 DE20101033633 申请日期 2010.08.06
申请人 SEUFFER GMBH &amp, CO.KG 发明人 MANN, ANDREAS
分类号 G05B24/02;G05F1/66;H02J3/14 主分类号 G05B24/02
代理机构 代理人
主权项
地址