发明名称 REPLACEMENT CONSTRUCTION METHOD OF BRIDGE AND DEMOLISHMENT METHOD OF OUTDATED BRIDGE USED THEREIN
摘要 A bridge replacing construction method and a bridge removal method are provided to quickly replace a bridge when replacing an existing bridge with a new bridge, and to improve bearing capacity. A bridge replacing construction method is composed of steps for installing a temporary bridge post(140), installing a new bridge supported by a supporting beam(120) on the temporary bridge post, removing an existing bridge, and moving the new bridge from the upper part of the temporary bridge post to the upper part of the existing bridge post.
申请公布号 KR20090036094(A) 申请公布日期 2009.04.13
申请号 KR20090019078 申请日期 2009.03.06
申请人 JANG, SHIN CHAN 发明人 JANG, SHIN CHAN
分类号 E01D22/00;E01D24/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址