发明名称 METHOD OF DETERMINING BENCH PRESSURE IN INJECTION WELLS
摘要 FIELD: oil-and-gas production. ^ SUBSTANCE: proposed method comprises forcing working medium into bench and measuring bottom hole pressure. Bench exposure zone in well is isolated by packers from top and bottom. Hot has or overheated steam is used as working medium. Bench pressure is controlled at well mouth during working medium injection by measuring pressure in tubes communicated with interpacker space. Note here that, at a time, pressure at well mouth in tubing used for working medium injection. Control over working medium breakthrough is performed using the increase in difference between tubing pressure and bench pressure. ^ EFFECT: control over oil deposit development by injection wells and preventing working medium breakthrough. ^ 1 dwg
申请公布号 RU2441152(C1) 申请公布日期 2012.01.27
申请号 RU20100127887 申请日期 2010.07.06
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 FAJZULLIN ILFAT NAGIMOVICH;AMERKHANOV MARAT INKILAPOVICH;STRAKHOV DMITRIJ VITAL'EVICH;ZIJATDINOV RADIK ZJAUZJATOVICH;OSNOS VLADIMIR BORISOVICH
分类号 E21B43/24;E21B47/06 主分类号 E21B43/24
代理机构 代理人
主权项
地址