发明名称 CONSTRUCTION SIMULATION METHOD AND APPARATUS
摘要 <P>PROBLEM TO BE SOLVED: To solve the problems that a construction scheduling process can not be rationally planned correspondingly to complicated installation of devices and piping of a power plant and that, since work for logically analysing and processing an installation result process requires time and efforts, automatic process generation based on a database of installation amounts or work man-hour is limited to partial application. <P>SOLUTION: A construction simulation apparatus has a 3D component arrangement position matching degree determination section and a result process selection section. The 3D component arrangement position matching degree determination section has an existent 3D model, result process data and a database recording a novel 3D model thereon and determines similarity in installation positions of devices or piping inside a building obtained by comparing the existent 3D model with the novel 3D model. The result process selection section selects result process data corresponding to a matched portion of the existent 3D model extracted by the 3D component arrangement position matching degree determination section in the novel 3D model from corresponding relation data in which the existent 3D model and the result process data are made correspondent, and defines the selected data as scheduling process data corresponding to the novel 3D model. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP2012014309(A) 申请公布日期 2012.01.19
申请号 JP20100148469 申请日期 2010.06.30
申请人 HITACHI-GE NUCLEAR ENERGY LTD 发明人 SEKI HIROSHI;YOKOTA TAKESHI
分类号 G06Q50/08;G06F17/50 主分类号 G06Q50/08
代理机构 代理人
主权项
地址